ON: Sunday 2014-11-01
ON: Sunday 2014-04-13
Parking at Ground Floor
ON: Sunday 2014-02-23
Internal Slab Work for 2BHK Tower 16 Flat 05:
Hall Balcony
Small Bedroom:
Bathroom in Hall:
Roof in Kitchen and Main Bedroom:
Kitchen and Master bedroom Bath room:
Master Bedroom space:
Kitchen Brick Work:
ON: Sunday 2013-11-30 (Nov 30, 2013)
Exclusive Block-3 (covering Tower 16 & 17)
Side by tower:
ON: Sunday 2013-05-11 (May 11, 2013)
ON: Sunday 2012-12-12 (Dec 12, 2012)
ON: Sunday 2012-09-16 (Sep 16, 2012)
ON: Sunday 2012-09-09 (Sep 9, 2012)
<